Infrastructure improvements included sanitary sewer extension, water-designed main loops, and stormwater management to incorporate rain gardens for water quality purposes. The site soils are moisture sensitive and required careful inspections by PS&S geotechnical field personnel to verify that adequate bearing was maintained below the building footings and for the extensive parking lot system designed by PS&S site civil engineers. Structural alterations of the existing racetrack clubhouse were carefully coordinated and scheduled to minimize impacts to the ongoing operation of the racetrack. PS&S provided site civil engineering, geotechnical engineering, and structural engineering for the facility. The front façade also featured huge electronic signage and long-span porte cochere roof structures. The new casino building included extensive open spaces that require long-span roof construction to accommodate these space needs. ![]() This required the phasing of work and the minimizing of construction impacts. PARX needed to have the racetrack clubhouse renovated while keeping the racetrack in operation. ![]() They also wanted an upgrade of the racetrack clubhouse at the site. The former Philadelphia Park Racetrack wanted to expand their operations to include a full casino featuring slots, table games, restaurants and other amenities.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |